The presentation same for both levels
Our advice
- Expand one decision from a project already in your report: the problem, your options, what you decided and why, and the result.
- Aim for about 13 minutes so a question or nerves don't push you past 15.
ICE's deadlines, a planner that works back from them, the attributes with graded examples, revision flashcards, review-day guidance and this week's industry news.
The order is fixed; the pace is yours. Check ICE's current guidance for forms, word limits and fees, because they change.
Not published yet by ICE: Professional Review cycles after June 2027, separate dates for Technical Report Route Stage 2, member (MICE) or EngTech reviews, resits or deferrals, and overseas sessions other than Hong Kong. We'll add them when ICE does.
The failures and standards that come up at review, then places to ask questions, find the code, read guidance and run a quick check. Where something lines up with an attribute, we've said which.
Reviewers often ask you to describe an industry failure and what changed because of it. Pick one close to your own work, and know what happened, why it happened, and what is done differently now. Tap one to open it.
What happened: in heavy rain on 1 August 2019, part of the concrete spillway on a 19th-century dam broke up. About 1,500 people were evacuated while the dam was shored up and the reservoir drawn down.
What changed: an independent review led by Prof David Balmforth made 22 recommendations, all accepted by government. A wider review of reservoir safety and a reform programme followed, moving towards a more risk-based regime.
What happened: 72 people died when fire spread up the outside of a 24-storey residential block that had been refurbished with combustible cladding. The Inquiry's final report (4 September 2024) found failures by government, regulators, manufacturers, designers and contractors over many years.
What changed: Dame Judith Hackitt's review, Building a Safer Future (May 2018), led to the Building Safety Act 2022, the Building Safety Regulator and new competence duties (see below).
What happened: one of the UK's largest contractors declared insolvency on 15 January 2018, part-way through hospitals, roads and rail work. MPs blamed aggressive accounting, bidding work at too little margin, and paying suppliers late.
What changed: more scrutiny of contractors' finances and of bidding on lowest price, and more attention to prompt payment down the supply chain. A good example for commercial questions.
What happened: a gas explosion in a flat blew out a load-bearing wall panel in a 22-storey precast block, and a whole corner of the building collapsed floor by floor. Four people died.
What changed: designing against disproportionate collapse (robustness and tying) entered the Building Regulations. It's now requirement A3 in Approved Document A.
What happened: a braced excavation for a metro line collapsed, killing four. The inquiry found errors in detailing the bracing connections and a design that overestimated the soil's strength.
What changed: a standard case for checking temporary works design independently and for acting on monitoring readings before they reach trigger levels.
What happened: two suspended walkways fell into a crowded atrium, and 113 people died. The hanger connections had too little capacity: the detail was changed during fabrication and the change wasn't properly checked.
What changed: the reference case for who owns a design change, and for checking connections, not just members.
What happened: a span of a 1960s motorway viaduct collapsed, killing 43. Its stays were steel encased in concrete, hard to inspect, and later inquiries pointed to poor maintenance and design weaknesses.
What changed: renewed attention, in Italy and beyond, to inspecting ageing structures whose critical parts can't be seen.
What it is: a confidential scheme where engineers report structural and fire safety concerns. Reports are published anonymously with expert comment. The Building Safety Regulator named it the official voluntary reporting system for building safety until at least 2028.
Why read it: the reports are short, recent and close to everyday work, so they're easy to use as examples at review.
What each one governs and when it applies to you. You won't need them all, but you should know the ones on your projects well.
The European design codes (EN 1990 to 1999) cover the basis of design, loads and each material. The UK National Annex to each one sets the UK's values, so you always use the two together. Second-generation Eurocodes are being published up to 2027, and BSI says the UK versions of the current ones will be withdrawn on 30 March 2028. Know which generation your project uses.
Applies to every construction project. As a designer you must eliminate, reduce or control foreseeable risks to people who build, use and maintain what you design, and pass on what others need to know. Projects with more than one contractor need a principal designer and a principal contractor. Expect a question on it at review.
Higher-risk buildings (at least 18 m or seven storeys, mainly residential) go through the Building Safety Regulator at gateways: approval before building work starts (Gateway 2) and before occupation (Gateway 3). All building work now has dutyholders with competence duties, including designers.
In England it covers reservoirs holding 25,000 m³ or more above the surrounding land. High-risk reservoirs must always have a supervising engineer and be inspected at least every 10 years by an inspecting engineer, both from government panels of qualified civil engineers.
The Design Manual for Roads and Bridges sets the standards for the strategic road network. Doing something different needs an approved departure from standard. Many local authorities use it too.
Department for Transport guidance (2007) for residential streets, putting place before movement. Manual for Streets 2 extends it to busier streets such as high streets and town centres. Used instead of DMRB for most local roads.
The code of practice for temporary works, now in two parts (2024): Part 1 covers managing temporary works, including the temporary works coordinator and categories of design check; Part 2 covers falsework design. If you work for or with a contractor, know who your temporary works coordinator is.
Much day-to-day work isn't governed by national codes. Drainage that a water company will adopt, and roads that a council will adopt, have to meet their own guidance. Checked 22 Nov 2026.
The Ofwat-approved rules, in force since April 2020, for building sewers that a water company will adopt. Its Appendix C, the Design and Construction Guidance, replaced Sewers for Adoption and sets pipe sizes, gradients, manholes, pumping stations and SuDS features that can be adopted. Free.
Water UK's page still calls version 2.2 (July 2022) the latest, but it also hosts version 2.3, approved in November 2023. Check with your water company which one it's applying. Each company also has its own developer services pages and local requirements.
The Building Regulations guidance for foul and surface water drainage from buildings, up to the point where it joins a public sewer, plus septic tanks and soakaways. The current edition is 2015. Free.
In Wales, see the Welsh Government's guidance on mandatory adoption of sewers and lateral drains (2012). In Scotland, Scottish Water's Sewers for Scotland, 4th edition applies to designs submitted from 1 January 2019. Both are free.
When a developer builds a road for the council to adopt (a section 38 agreement), or works on an existing road (section 278), the council's own design guide, specification and standard detail drawings govern. DMRB is written for motorways and trunk roads; councils mostly lean on Manual for Streets for layout and cite DMRB only for particular things, such as road safety audits. Each council's rules differ, so search for "[your council] highway design guide" or "section 38".
Some examples, all free:
Attribute 1 · Attribute 3 (bonds, fees and commuted sums)
Links checked 22 Nov 2026. Free open to anyone. Free, sign-up needs an account. Members free to members of that body. Paid costs money, often covered by your employer.
Long-running forums for practising engineers, strongest on structures and geotechnics. Search before you post: most questions have been answered. Many members work to US codes, so check which code an answer assumes.
Careers, pay and day-to-day practice. Mostly US, so filter for UK threads. Good for "how do others handle this", not for design answers.
The DMRB and the Specification for Highway Works, with downloads of the set current on any date. A free account adds bookmarks and update emails.
All the Building Regulations guidance for England in one searchable PDF, including Part A (structure).
The official guidance on the CDM Regulations: designer duties, the principal designer and the construction phase plan. Worth reading before your review.
Searchable list of GB rail standards and the Rule Book. Network Rail company standards are separate and usually come through your employer.
Sold by BSI. Most employers and universities subscribe to British Standards Online, so ask before you buy.
SCI's guides to Eurocode 3 as free PDFs, with a starter set for beginners. The wider site explains steel design topic by topic. SCI's NCCI documents are free with sign-up.
The standard UK guides to concrete design, including How to Design Concrete Structures and Worked Examples to Eurocode 2 (£30 download).
Industry guidance on drainage, ground engineering, temporary works and the environment. A few titles are free with sign-up; most are free to member organisations, so check whether your employer is one. The SuDS Manual (C753) is listed via susdrain.
Plain-English explainers on about 21,000 construction topics, from contracts to CDM. Good for a quick primer before a meeting or your review.
Online calculators for loads, concrete, steel and seismic design, with UK National Annex values and printable reports.
Reactions, shear, bending and deflection for a beam, with the hand calculation shown. Full design software is paid.
The British Geological Survey's map of borehole records and geology. The first place to look on a desk study.
Free calculators are for learning and checking. Check by hand and against the code, and use your firm's verified tools for anything you issue.
CPD articles, case studies and recorded Tech Talks, organised by ICE's CPD topics. The password has been removed for now, so anyone can read it.
ICE's journals and books. Membership includes four issues a year of Civil Engineering, the last three years of journals you subscribe to, and the archive from 1836 to 1900. Other journals are discounted by up to 90%.
Left out: TRL's free report library, because we couldn't confirm it's still free; and recommendations we couldn't check. Know a good one? Tell us through Community.
Where the paths lead, what each level expects, and what it pays. Every figure shows its source and date.
Your report and review are assessed against seven attributes. For each one, here's what good evidence covers, the bar for your level, and questions to test your own examples.
Pick a cycle or type your own dates. The planner works back to when to start each stage, then forward to your review.
Durations are suggestions based on how candidates commonly plan, not ICE requirements. The stages follow ICE's process: evidence against the attributes, report reviewed and signed off by your supervisor or mentor, submission, then a review with a presentation, interview and communication task.
Pick a deck, answer out loud, then flip. Mark each card so the ones you don't know come back. Your progress stays in this browser only.
Keys: Space flip, ← → move, K know it, R review again. Prefer a list? See the practice questions on one page.
What happens on the day, what ICE says about each part, and practical advice. Facts from ICE's guidance are marked ICE with a page number; everything under "Our advice" is our own suggestion.
Both levels: a 15-minute presentation and two peer reviewers, online on Teams or in person. You're assessed against the attributes at CEng MICE level (see Attributes). The sections below follow this choice.
| Online (Teams) | In person | |
|---|---|---|
| Presentation | Share your screen on Teams. | Across a table. Visual aids up to A3; a laptop is allowed, but no power supply is provided. |
| Communication task | Typed on your own computer. If you handwrite any of it, have a way to scan it quickly. | Bring your own laptop. Handwriting is accepted only in exceptional circumstances. |
| Submitting the task | Same for both: upload it as PDF or Word to ICE's secure site within 15 minutes of the end time. | |
| What you need | A reliable connection, a laptop or PC with webcam and headset or mic, power, and a private room. Have your submission open and paper and pen ready. | Arrive at least 30 minutes early to register. Bring a copy of your submission, your visual aids, laptop and power cable. |
| On the day | Same for both: dress professionally, bring ID and have water to hand. (p. 24) | |
| Technical problems | ICE can't help with your own equipment. Extra time may be given. | |
Sources: ICE guidance pp. 13-14, 24, 26-27.
Open a question to see what a good answer covers. Then answer it out loud using your own project.
Reviewers expect you to follow the industry. Scan the latest headlines from NCE, ICE and other engineering and government sources, then read the monthly briefing for each sector's stories, and the weekly archive for how to use them in an answer.
Items marked Headline only come from a headline alone. Read the full article before quoting figures.
Headlines link to the original article on the publisher's site. Some, including NCE, may need a subscription.
Built automatically from the month's headlines and grouped by sector, so it stays current without anyone writing it. It lists and links the stories; it doesn't summarise them, so open the articles for the detail.
TBC. An AI reviewer that reads a section of your report against the seven attributes is planned, but it isn't ready yet.
TBC. This feature is still to come. Until then, use the Attributes page and your mentor to check your report.
The reviewer is told what ICE reviewers look for under each attribute, the extra the chartered level asks for, and the common reasons reports fall short: writing as "we", no numbers, reflections that don't say what changed, claims that go beyond your role, and figures that don't add up. It can be wrong. Treat it as a second pair of eyes, not a verdict, and always take your supervisor's or mentor's advice over it.
The facts to glance at before your review, on one page. Each block links to its source; check anything you plan to quote.
The one-page sheet above uses very small text to fit everything on one side, so it doesn't meet the font rule. This export uses the sections you've chosen under Customise, plus your own notes, at a normal text size, and only lets you print if it fits on 2 sides of A4. Save it as a PDF if you want a soft copy.
Our advice: pick the text size you normally work in. ICE's guidance doesn't say whether notes are checked on the day, so keep them to facts and figures you'll refer to, not paragraphs you'd want to copy. If you're unsure, ask ICE at professional.reviews@ice.org.uk.
CEng: develops solutions to engineering problems using new or existing technologies, through innovation, creativity and change.IEng: maintains and manages applications of current and developing technology.
Our judgement, not ICE guidance · Attributes page
AI: accountability can't be delegated to AI; disclose your use. Bullying and harassment are named for the first time.
CECA NEC4 bulletin · check clauses against the contract
The presentation takes one aspect of a project you've already written about and goes deeper. Here's how to choose it, structure it, and design slides that help rather than get in the way.
ICE doesn't set a number of slides or a structure. Everything else on this page is our advice.
Several attributes will come through naturally (engineering judgement, commercial, safety, communication). That's fine, but don't try to tour all seven: ICE says not to.
Fill this in before you open your slide software. It's saved in this browser only.
Drawn for this site. The projects and figures are made up.
Ask questions, share what came up in your review and find someone to run a mock review with.
The forum opens soon. Posting is switched off while we set it up. The threads below are examples of what the forum is for, not real posts.
Pair up by sector and review date, and run each other's presentation and interview under time.
After your review, tell others which questions came up for each attribute. No names, no employers.
Be kind. Don't share anyone's report or confidential project information. Anything about the process should be checked against ICE's own guidance.